Prepare a final toolkit PowerPoint to present to the class, Staff and faculty about toolkit project.

INTEREST RATE RISK (IRR) MANAGEMENT:
A TOOLKIT FOR SMALL BANKS or SMALL CREDIT UNIONS.

Part A – Due on 4/5/23
I. INTRODUCTION
A. Scope
To document the activities undertaken to evaluate potential risks related to interest rate risk management in small bank or small credit union sectors and recommend an IRR Management Toolkit for these organizations.
B. Background Information
II. DESCRIPTION OF RISK and RISK MANAGEMENT
A. Identify areas of concern related to IRR management
B. Assess current risk and trends in the sector you selected
C. Evaluate changes within the sector
D. Assess adequacy of the sector’s IRR identification processes

III. THE IRR MANAGEMENT TOOLKIT
A. A collection of tools you recommend to evaluate potential risk related to IRR Management. Describe each tool.
IV. CONCLUSIONS (½ a page)

PART B – Due on 4/3/23

The assignment for the class is as follows:
1. Each of you will be required to prepare a 10 minutes progress PowerPoint presentation on your project.
2. The presentation will cover SECTION 1 from the Required Outline that was emailed to you.
I. INTRODUCTION
A. Scope of the Study
B. Background .

PART C – Due on 4/5/23
Prepare a final toolkit PowerPoint to present to the class, Staff and faculty about toolkit project.

Latest News

Discover your perfect program in our courses.